| The
strength of the Foundry lies in the in-house
facilities and know-how
built up over several years. Die and pattern requirements
are met fully in-house with a tool room equipped with CAD/CAM systems,
High speed CNC milling machines, Hydraulic copy milling machines
& 3 Co-ordinate Measuring Machine.
The
developmental
lead time for new products is between
3 and 7 weeks depending upon the nature of
the job. The
Foundry Division has installed solidification
simulation software for new product development
to do it right first time, every time.
The laboratory is well equipped to check all incoming materials,
metal charges, sand resins and to conduct integrated checks on production
processes as well as metallurgical checks on finished castings.
|
|